System Overview
SiteNsight SME Validation Engine · All 33 divisions · Real-time
Active SMEs
18
of 33 onboarded
Open Prompt Packs
47
31 system-gen · 16 user-triggered
CKU Reviews
23
Pending approval
SLA Breaches
3
>7 days without review
CKUs Published
214
176 proactive · 38 reactive
⚠
SLA Breach — 3 Items Overdue >7 Days
Confined Space Entry (Div CI), Arc Flash Boundary (Div 26), and Hazmat Disposal Protocol (Div 01) have exceeded the 7-day validation SLA. Recommend reassignment or direct outreach to assigned SMEs.
Division Coverage — Phase 1
18 of 18 assigned| Division | SME | Open Items | Approval Rate | SLA Status | |
|---|---|---|---|---|---|
| Div 07 Thermal & Moisture | CA Curt Allen | 12 open | 94% | ✓ On track | |
| Div 26 Electrical | MR Marcus Reid | 8 open · 1 breach | 78% | ⚠ SLA Breach | |
| Div 03 Concrete | PJ Patricia Jones | 6 open | 88% | ✓ On track | |
| Div 23 HVAC | DW David Wu | 4 open | 91% | ✓ On track | |
| CI Civil / Site Work | TN Thomas Nguyen | 7 open · 1 breach | 65% | ⚠ SLA Breach |
Unassigned Divisions
15 remainingPhase 2 & 3 divisions still need Founding SME recruitment. Each requires one credentialed expert.
Div 10 — Specialties
Recruiting
Div 11 — Equipment
Unassigned
Div 12 — Furnishings
Unassigned
Div 14 — Conveying
Recruiting
+ 11 more Phase 2/3 divisions
SME Accounts
All active and pending Subject Matter Expert accounts
Active
18
Phase 1 divisions
Pending
4
Awaiting onboarding
Invited
6
Code issued, not logged in
Unassigned
15
Divisions need SMEs
All SME Accounts — 28 total
| SME | Division | Access Code | Status | Last Active | Open Items | Approval Rate | Actions |
|---|---|---|---|---|---|---|---|
CA Curt Allen, PE Licensed PE · Div 07 |
Div 07 | SME-D7E9 ⧉ | ● Active | Today, 9:47am | 12 | 94% | |
MR Marcus Reid, PE Licensed PE · Div 26 |
Div 26 | SME-26F3 ⧉ | ● Active | Yesterday | 8 ⚠ | 78% | |
PJ Patricia Jones Master Specifier · Div 03 |
Div 03 | SME-03A1 ⧉ | ● Active | Mar 4, 2:30pm | 6 | 88% | |
DW David Wu, P.Eng Mechanical PE · Div 23 |
Div 23 | SME-23C8 ⧉ | ● Active | Mar 4, 11:14am | 4 | 91% | |
TN Thomas Nguyen, PE Civil PE · Civil / Site |
CI | SME-CI91 ⧉ | ● Active | Mar 2, 4:20pm | 7 ⚠ | 65% | |
SR Sandra Robinson Structural Engineer · ST |
ST | SME-ST44 ⧉ | ⏳ Invited | Never | — | — |
Create SME Account
Onboard a new Subject Matter Expert · Access code is auto-generated
Personal Information
SME's professional details — name will appear on all CKU attributions
Professional Credentials
Used for CKU attribution and trust verification
Division Assignment
Assign the primary CSI MasterFormat division this SME will validate
Programme Terms
Honorarium and revenue share details for this SME's agreement
Access Code
Will be auto-generated on account creation. Unique to this SME. Routes them directly to their assigned division queue.
SME-????
Code format: SME-XXXX · Expires in 14 days · Email + code authentication required
What happens next
1
Account created, access code generated
2
Welcome email sent with portal link + access code
3
SME logs in, receives first assigned prompt packs
4
CKU attributions go live on first approved validation
Phase 1 Coverage
Assigned (18/18)
100%
Active & validated
83%
Pending onboarding
17%
Assign Prompt Packs
Route unassigned prompt packs to the right SME · 7 unassigned
Unassigned Prompt Packs — 7 items
| Prompt Pack | Division | Risk | Confidence | Created | Assign To | |
|---|---|---|---|---|---|---|
PP-2044 — EPDM Lap Splice Cold Weather Scenario: Material installation · Building: Commercial |
Div 07 | Medium | 0.68 | Mar 5 | ||
PP-2043 — Anchor Bolt Edge Distance Verification Scenario: Compliance check · Building: Industrial |
ST | Medium | 0.74 | Mar 4 | ||
PP-2042 — Arc Flash Boundary 480V Switchgear Scenario: Safety check · Building: Commercial |
Div 26 | High ⚡ | 0.58 | Mar 3 |
Queue Monitor
Real-time validation queue across all active SMEs · 3 SLA breaches
⚠
3 SLA Breaches — Action Required
Div 26 (Marcus Reid): Arc Flash item at 9 days. Civil (Thomas Nguyen): Confined Space at 8 days. Div 01 (assigned): Hazmat Protocol at 12 days — unassigned. Recommend direct outreach or reassignment.
CA
Curt Allen, PE
Div 07 — Thermal & Moisture
12
Open
94%
Approval
3.8d
Avg time
3 High Risk
✓ No breach
MR
Marcus Reid, PE
Div 26 — Electrical
8
Open
78%
Approval
9.1d
Avg time
1 High Risk
⚠ SLA Breach
PJ
Patricia Jones
Div 03 — Concrete
6
Open
88%
Approval
4.2d
Avg time
✓ On track
DW
David Wu, P.Eng
Div 23 — HVAC
4
Open
91%
Approval
3.1d
Avg time
✓ On track
TN
Thomas Nguyen, PE
Civil / Site Work
7
Open
65%
Approval
8.4d
Avg time
2 High Risk
⚠ SLA Breach
+
15 divisions unassigned
Phase 2 & 3 SME slots
Prompt Pack Management
All system-generated and manually created prompt packs
All Prompt Packs
| Pack | Origin | Division | Risk | Assigned SME | Status | Created | |
|---|---|---|---|---|---|---|---|
PP-2041 — EMT Conduit Firestop · 2-Hr Assembly | ◈ Proactive | Div 07 | High ⚡ | Curt Allen | In Review | Mar 5 | |
PP-2040 — Roof Insulation R-Value IBC Zone 4A | ◈ Proactive | Div 07 | Low | Curt Allen | ✓ Completed | Mar 3 | |
PP-2039 — Rebar Lap Splice Length — ACI 318 | ⚡ Reactive | Div 03 | Medium | Patricia Jones | In Review | Mar 4 | |
PP-2038 — EPDM Lap Splice Cold Weather Install | ⚡ Reactive | Div 07 | Medium | Unassigned | Unassigned | Mar 4 |
CKU Library
214 published · 23 pending approval · 12 rejected
All CKUs
| CKU | Division | Risk | Confidence | Validated By | Status | Version | Published |
|---|---|---|---|---|---|---|---|
CKU-2041 — EMT Conduit Firestop Compliance Fire-rated assembly · Penetration integrity | Div 07 | High ⚡ | 0.91 | Curt Allen, PE | Needs Review | v3 Draft | Pending |
CKU-1847 — Roof Insulation R-Value Zone 4A Energy code compliance · ASHRAE 90.1 | Div 07 | Low | 0.94 | Curt Allen, PE | ✓ Published | v2 | Mar 3 |
CKU-1831 — Rebar Cover Depth — ACI 318-19 Concrete protection · Corrosion prevention | Div 03 | Medium | 0.89 | Patricia Jones | ✓ Published | v1 | Mar 1 |
CKU-1803 — Vapor Barrier Placement IECC Moisture control · Code compliance | Div 07 | Medium | 0.61 | Curt Allen, PE | ✗ Rejected | v1 | — |
Knowledge Base
4 ingestion tiers · Baseline intelligence before any field capture · Proactive edge case source
◈
Proactive Path — This is what the system knows before any user submits a query
The knowledge base is the source of Path A (Proactive) SME validation. The system analyses these 4 tiers, identifies edge cases and conflicts, and generates prompt packs for Founding SMEs — seeding the CKU library before launch. Every CKU published from this source costs nothing in user acquisition.
Tier 1 — Codes
6
IBC · OSHA · NFPA · ACI · IECC · Local
Tier 2 — Specs
847
Manufacturer spec documents ingested
Tier 3 — CSI
33
Active MasterFormat divisions
Tier 4 — Failures
12,400
OSHA citations + litigation records
Tier 1 — Codes & Standards (Trust Backbone)
| Source | Description | Chunks | Status |
|---|---|---|---|
| IBC 2021 | International Building Code | 18,440 | ● Indexed |
| OSHA 29 CFR | Safety standards · All parts | 22,180 | ● Indexed |
| NFPA 101 | Life Safety Code | 9,820 | ● Indexed |
| ACI 318-19 | Concrete structural standard | 11,240 | ● Indexed |
| IECC 2021 | Energy conservation code | 6,340 | ● Indexed |
| Local Jurisdictions | Phase 2 expansion · 47 jurisdictions | — | Phase 2 |
Tier 4 — Failure Mode Data (Edge Case Engine)
| Source | Records | Edge Cases Surfaced | Status |
|---|---|---|---|
| OSHA Citation DB | 12,400 | 841 edge cases | ● Indexed |
| Public Litigation Records | 3,841 | 312 edge cases | ● Indexed |
| Trade Assoc. Bulletins | 2,180 | 441 edge cases | ● Indexed |
| Founding SME Contributions | — | Growing | ● Live |
| Enterprise Project Docs | — | Phase 2 via GC agreements | Phase 2 |
Proactive Edge Case Coverage — CKUs Validated vs Outstanding
1,594 total edge cases identifiedEdge Case Validation Progress by Division
176 of 1,594 proactive edge cases validated · 11% coverage · Growing with each Founding SME cycle
| Division | Edge Cases Identified | CKUs Validated (Proactive) | Coverage | SME Assigned | Priority |
|---|---|---|---|---|---|
| Div 07 — Thermal & Moisture | 312 | 48 CKUs | 15% | Curt Allen, PE | Active |
| Div 03 — Concrete | 241 | 38 CKUs | 16% | Patricia Jones | Active |
| Div 26 — Electrical | 287 | 31 CKUs | 11% | Marcus Reid, PE | ⚠ SLA |
| Div 23 — HVAC | 198 | 41 CKUs | 21% | David Wu, P.Eng | Active |
| CI — Civil / Site | 221 | 18 CKUs | 8% | T. Nguyen, PE | ⚠ SLA |
| Div 10–14 + Others (Phase 2) | 335 | 0 CKUs | 0% | Unassigned | Recruiting |
Audit Trail
Complete system-wide validation history · Every action logged
| Timestamp | Actor | Action | Object | Division | Outcome | IDs |
|---|---|---|---|---|---|---|
| Mar 5 · 09:47am | CA Curt Allen | Approved with Edits | CKU-2041 v2 — EMT Firestop | Div 07 | CKU → v3 Draft | PP-2041 · CA-7 |
| Mar 5 · 08:22am | CA Curt Allen | Submitted Response | PP-2041 — EMT Firestop | Div 07 | CKU drafted | PP-2041 · RESP-CA |
| Mar 5 · 07:14am | SYS System | Prompt Pack Created | PP-2041 — Life-safety flag triggered | Div 07 | Assigned to CA | PP-2041 |
| Mar 4 · 03:30pm | AO Angela Okoro | Account Created | SME: Sandra Robinson · Div ST | ST | Code: SME-ST44 | SME-ST44 · ADMIN |
| Mar 3 · 02:30pm | CA Curt Allen | Approved | CKU-1847 — Roof Insulation | Div 07 | Published | CKU-1847 · PP-1831 |
| Feb 28 · 03:15pm | CA Curt Allen | Rejected | CKU-1803 — Vapor Barrier IECC | Div 07 | Returned | CKU-1803 · PP-1798 |
| Feb 27 · 10:00am | AO Angela Okoro | Code Issued | SME: Thomas Nguyen · Civil | CI | Active | SME-CI91 · ADMIN |
System Metrics
All divisions · All SMEs · Pilot period to date
CKUs Created
214
Target: 50–150 ✓
Approval Rate
72%
Target: 60–80% ✓
Avg Validation Time
5.1d
Target: <7 days ✓
SLA Breaches
3
Active — requires action
High-Risk Reviews
38
All with SME sign-off ✓
Unvalidated Incidents
0
No unsafe guidance published
Follow-up Rate
17%
Needs-more-info requests
SME Performance
| SME | Approved | Rejected | Rate | Avg Days |
|---|---|---|---|---|
CA Curt Allen | 48 | 3 | 94% | 3.8d |
PJ Patricia Jones | 38 | 5 | 88% | 4.2d |
DW David Wu | 41 | 4 | 91% | 3.1d |
MR Marcus Reid | 35 | 10 | 78% | 9.1d |
TN T. Nguyen | 28 | 15 | 65% | 8.4d |
CKU Coverage by Division
Div 07 — Thermal
88%
Div 03 — Concrete
82%
Div 23 — HVAC
79%
Div 26 — Electrical
68%
CI — Civil
54%
Div 22 — Plumbing
44%
Div 21 — Fire Supp.
38%
ST — Structural
22%